Putty / Filler application - Aluminum

35 Line

TST 56 (1).png

1. Masking

  • Mask the repair area
  • make sure to mask with soft edges, hard edges will leave marks in basecoat.
  • Clean with 70U-10
23U-10 Aerosol

2. Etching Aerosol 23U-10

TST 56 (2).png

3. Primer application

  • Aerosol application, apply 2-3 coats over the bare aluminum.

Application:

Flash off:

  • 2-5 mins between coats, 15-20 mins final flash at 68°F (20°C)
product_preparation_20U

4. Product preparation

  • Prepare undercoat accoridng to color 20-24
  • To obtain different colors, fillers can be mixed
mixing-ratio-20U-50U-60U

5. Mixing ratio

  • 20U-24/-34/-94          4
  • 50U-15/-20/-30          1
  • 60U-10/-20/-30/-40    1 
TST 56 (3).png

6. Application of filler

  • Spray 1-2 wet coats on repair with 5 min flash between coats.
  • Stay with second coat in the pattern of first coat as shown on the picture

Dry Properties

  • 5-7 min short wave
  • 1-1.5 hours at 68°F (20°C)
  • 30-40 min at 140°F (60°C)
  • Allow 10 min flash before baking
TST 56 (4).png

7. Sanding guide

  • Use of sanding guide, highlights surface imperfections and possible sand scratches prior to finish with abrasives.
TST 56 (6).png

8. Sanding steps

  • Fine sand area with 3mm orbit machine and P320
  • finish with P400/ P500
  • Blend in area P1000/2000
TST 56 (7).png

9. Cleaning

  • Clean carefully with 70U-10 
Repair Steps

Start working with baslac today. It just makes sense.

Get in touch with your local baslac dealer now and start working smarter.