baslac e-finder star Introduction
e-finder
1. Instrument Top and Bottom View
LED Indicator:
The LED indicator gives a visual indicator for measurement.
Display:
The display features options for the job list which is used to view and add new jobs, settings menu access as well as Wi-Fi info.
2. Instrument Side View
2. Instrument Side View
Power Off\On – Measurement Button:
This side button can be used to turn the device on and off as well as initiate a measurement.
Calibration Alignment Indicator:
This white line helps align the instrument onto the calibration tile. This is also an indicator of where a measurement will be taken.
Calibration Alignment Indicator:
This white line helps align the instrument onto the calibration tile. This is also an indicator of where a measurement will be taken.
Wrist Strap Attachment
3. Docking Station
The unit comes with a docking station which provides a safe, dust fee place to store the device. This docking station doubles as a charging station and communication hub.
4. Calibration
Calibration is required every 20 days. Message will appear after 20 days.
5. Calibration Part 2
Access the calibration setting to review how many days until next required calibration and calibrate unit here.
6. Calibration Process
Calibration expired message will appear with the option for calibration.
7. Calibration Process Part 2
1.) Calibration expired message will appear with the option for calibration. Click the green “Calibration” button to begin
2.) Align the instrument on the white tile. The instrument should fit securely with white alignments.
3.) Select yes to start
4.) Do not move instrument. The instrument will complete the process.
5.) Calibration is complete
8. Calibration- Self Test
After the calibration process is complete there is an option for the “Self-Test”.
Select “Yes” to continue the self-test. The instrument must be on the calibration tile as described in the calibration process.
Click “Start” and begin, the progress bar will update as the process completes.
When finished the “Self Test Complete" message will appear.