CV 30 Topcoat application

30CV

TST 04 (3)

1. Cleaning

  • Clean carefully with cleaner 70-10
  • Use wipe on, wipe off method (2 cloths)
TST 04 (4)

2. Mixing ratio: Topcoat

  • 30 CV- Topcoat  100%
  • 51-   hardener       50%

Temperature chart

  • Pot life  1.5-2h/20°C
  • Spray viscosity at 20°C    Approx 20-24 s
TST 04 (2)

3. Basecoat 1st coat

  • Spraygun
  • HVLP gravity-feed spraygun 1.5 mm 0.7 at the nozzle.

Or

  • Compliant Gravity-feed  Spraygun 1.4 mm 2.0 bar

Or

  • Airless/airmix 0.23-0.28 mm 120-180 bar/+ max 2 bar atomization air.
  •  
  • Application:
  • Apply first coat
  • Flash off 3 min
TST 04 (1)

4. Basecoat 2nd coat

  • Apply second coat
  • Flash off and baking
  •  
  • Drying
    • 51-515  at 20°C 6h/at 60°C 25 min
    • 51-520 at 20°C 8h/at 60°C 30 min
    • 51-530 at 20°C 16h/ at 60°C 45 min
Repair Steps