原子灰施工工艺 - 金属件- CV 30系列 30CV 1. Preparation for putty Clean carefully with 70-10 Sand the damage with P150 For small repairs, keep the sanding area as small as possible 2. Mixing ratio of putty 12-20 Putty 100% 56-20 Hardener 3% by weight Mix until uniform color Dry properties 20 min at 20°C 4 min short wave 3. Sanding guide Use of sanding guide, highlights surface imperfections and possible sand scratches prior to finish with abrasives 4. Sanding steps Hand block the putty first with P 150/240 5. Sanding steps Fine sand the area with orbit machine: P 240 Surround area with P 320 6. Cleaning Clean carefully with 70-10 Use wipe on, wipe off method (2 cloths) Repair Steps 原子灰 立即开始使用百事利。这是有道理的。 让我们聊聊 立即联系您当地的百事利经销商,开始更智能地工作。 查找您附近的经销商